[Staff] [Board] UUCB Heating System
Karen
karjarmstrong at aol.com
Sat Mar 23 17:44:07 EDT 2024
I agree with removing the signs.
Karen
Karen ManzerOffice Administrator/ Membership Coordinator
Unitarian Universalist Congregation of Binghamton183 Riverside DriveBinghamton, NY 13905office at uubinghamton.orgwww.uubinghamton.org
On Saturday, March 23, 2024 at 01:51:14 PM EDT, Carolyn Greenstrom <csg349 at nyu.edu> wrote:
I think removing and storing the signs is a good plan.
Sent from my iPhone
On Mar 23, 2024, at 1:39 PM, Shawn Steketee via Board <board at uubinghamton.org> wrote:
I have no objection to temporarily storing the signs.
Shawn
Pronouns she/her/hers
On Saturday, March 23, 2024, 1:23 PM, Tim Wolcott via Board <board at uubinghamton.org> wrote:
Wes,
I do not object to storing the signs temporarily.
Tim
Sent from my iPhone
On Mar 23, 2024, at 11:55 AM, Wes Ernsberger via Board <board at uubinghamton.org> wrote:
Hi Emily,
Thanks for your questions.
Drainage: I have studied the situation several times and concluded that all the water that goes over the back parking lot from the discharge well seems to be soaking into the ground at the south edge where the bank starts, so long as the ground is not frozen. So I don't think we need to do anything there. From studying the pitch of the parking lot surface, I'm convinced that the puddle that forms in front of the visitor signs and the puddle that forms in the connector to the Guthrie lot are separate drainage problems that are unrelated to the overtopping of the discharge well. In the short term, they may benefit from additional ditches or better clearing the existing ones .. but probably not much. There needs to be a larger scale project to deal with those and I think Guthrie needs to be involved. Carl is our rep to Guthrie and he is aware of this problem.
Visitor signs: As you know, I think those signs should be removed until the drainage problem has been resolved. However, that is just my opinion. I think we need to have a reasonable amount of consensus before we remove them: All: Does anyone object to our temporarily removing those signs? One variation on this is to move the signs elsewhere but that takes up parking spaces and is a fair amount of work to do. So my vote is to simply take them out and store them in the shed.
Wes
On Sat, Mar 23, 2024 at 10:20 AM Hotchkiss-Plowe Family <hotchkiss.plowe at gmail.com> wrote:
Wes,
Is any additional ditch digging required to help with the excess overflow?
Also, are we planning on removing the First Sunday Visitor Parking signs as was suggested? Is assistance needed?
Ben and/or I can help as needed, just don’t want to do things without consultation.
Emily
Sent from my iPhone
On Mar 22, 2024, at 8:24 PM, Wes Ernsberger via Board <board at uubinghamton.org> wrote:
Update: I've switched us back to the GSHP system a bit quicker than I had expected because the backup system stopped working. That means that the overtopping of the discharge well is back. We can work on the backup system starting Tuesday when Ed gets back home. Meanwhile, looking at the weather forecast, I believe we'll be ok although there may be some ice forming on the back parking lot on some mornings, melting later in the day.
Wes
On Tue, Mar 19, 2024 at 7:46 AM Wes Ernsberger <wesernsberger at gmail.com> wrote:
FYI, the GSHP discharge well (near the bottom of the steps to the back parking lot) overtopped again yesterday, resulting in water flowing over the back parking lot. I talked it over with Ed and Scott. Since there is below-freezing weather coming up and we don't want ice to form on the back parking lot and become a potential safety hazard, we decided to switch to the backup system, which I did yesterday evening.
Note: We continue to use the GSHP system to heat the Fireside Lobby and the Chapel because those areas are not covered by the backup system. The amount of water used for just this area is small enough that the discharge well can handle it and it doesn't overtop.
We don't use the backup system much so there may be uneven heating in some of the rooms. Feel free to adjust the temperatures on the old system thermostats, as necessary, and also feel free to contact me about anything. If you adjust the temperatures, be sure to use HOLD so that it won't revert back to its program (of 60 degrees) at the start of the next setback time period.
I have notified Dailey Geothermal, our installer. Until this problem is resolved, my plan is to go back to the GSHP system once we get warmer weather because then there is no freezing issue in case it overtops again. We would just get some water on the back parking lot.
Wes
_______________________________________________
Board mailing list
Board at uubinghamton.org
http://uubinghamton.org/mailman/listinfo/board_uubinghamton.org
_______________________________________________
Board mailing list
Board at uubinghamton.org
http://uubinghamton.org/mailman/listinfo/board_uubinghamton.org
_______________________________________________
Board mailing list
Board at uubinghamton.org
http://uubinghamton.org/mailman/listinfo/board_uubinghamton.org
_______________________________________________
Board mailing list
Board at uubinghamton.org
https://urldefense.proofpoint.com/v2/url?u=http-3A__uubinghamton.org_mailman_listinfo_board-5Fuubinghamton.org&d=DwICAg&c=slrrB7dE8n7gBJbeO0g-IQ&r=n-fSpdUeoUMszI5HS6MUu0mgKvwZD7PTkzD5EJsVypw&m=U1VIdjYnzq9TCiSiIeiFf6mvwm8BnSgqimvuvHrp-T4Z_KMAVaTwXe5sekNQhW8y&s=rCekwXcgaw68fz5NbK7v46YaICv18_-PLiMBZoUr-JA&e=
--
Staff mailing list
Staff at uubinghamton.org
http://uubinghamton.org/mailman/listinfo/staff_uubinghamton.org
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://uubinghamton.org/pipermail/staff_uubinghamton.org/attachments/20240323/85c23a01/attachment.htm>
More information about the Staff
mailing list